• Ensures that he is aware of ADCO HSE rules and regulations, work procedures, job locations, equipment to be worked on, tools and equipment to be used and defining the anticipated start and finish time / date and number of days.
• Shall submit permits / certificates (new request or for revalidation) for Area Authority (AA) approval one day in advance and during daylight hours .
• Attend the PTW meeting with the JO ,AA & HSE on the day before start of the activity to revalidate the TRA in case of high risk activity.
• Shall attach the TRA for HRA along with the submission of the permit / certificates
• On the following day, and before the start time of the task, the Job Performer shall print out the permit/ certificate and proceed to the work location directly waiting arrival of Issuing Authority (IA) and Authorized Gas Tester (AGT) if gas test is required.
• The presence of JP or his crew at site does not mean to start the task, before approving and issuing the permit / certificates officially to him by IA. JP who starts the task before the permit / certificate are issued will be considered a violator of PTW procedure and Life Protection Rules. Equipment entry into the well site (apart from hazardous area) is covered by the permit approved by AA and does not consider a violation to PTW procedure although the permit is not yet approved by IA
• JP is directly responsible for the safety and quality of work and must ensure that the conditions specified on the PTW / Certificates are adhered to and remained unchanged at all time.
• Ensures that no other task is performed or other tool is used except as specifically described on the PTW / Certificate.
• Implements the Work Site Precautions as identified by the Area Authority and checked by Issuing Authority on the PTW / Certificate and TRA.
• Visibly displays the printed out copy of permit / certificate at the worksite during the duration of the work.
• It is required to use PDA at remote areas to accept permit / certificates
• Conducts a Toolbox Talk (TBT) immediately before commencing the job
• Remains at the worksite during the duration of the work and obtains Job Originator / Area Authority signature if Job Performer replacement is required.
• Immediately suspends work in the event of the Emergency Siren or General Alarm being activated. o JP shall keep using the 1st day permit / certificates copy for the whole duration period as stipulated in permit / certificates and to be signed daily at location by him, Issuing Authority and Authorized Gas Tester (if applicable).
• Shall daily re-validate permits / certificates through the ePTW system without making new prints
*** تقدم على الرابط التالي : Apply on the following link ***
https://www.naukrigulf.com/job-performer-foreman-level-jobs-in-abu-dhabi-uae-in-indman-dmcc-5-to-10-years-jid-290819000073
You can register your CV at bayt.com to apply for premium jobs.